EDGE Zeus algorithms alerted the FM team to a large load increase of 60kW in specific chilled and condenser water pumps. Consumption graphs displayed on our online EDGE platform were used to demonstrate the detrimental impact the problem had upon energy consumption and costs. This prompted a quick response from the team whose investigation found the BMS was being overridden and all pumps were running beyond the schedule program on the BMS.

The BMS contractor fixed the issue the next day which achieved a substantial annual saving of £44,800 as this problem would have gone unnoticed for sometime without the intervention of Zeus.