EP&T Global

Did you know?

Our clients have been ranked No1 in the Dow Jones Sustainability World Index for Real Estate for the past six out of seven years.

44%

Energy savings achieved to date at York House, British Land HQ, London.

Did you know?

EP&T's pioneering technology is used in British Land’s new London landmark, The Leadenhall building.

Marina Residences, Palm Jumeirah

Significant reductions in energy and water consumption

Tornado Tower, Doha, Qatar

Achieved 27% electricity reduction – exceeding target. Return of investment delivered in 13 months.

Diageo, Australia

Delivering operational savings and sustainability reporting services

Diageo, Australia Deutsche Bank, Australia

Significant reductions in energy, water and waste

RPAH Medical Centre, Australia

Increased building rating by three stars (NABERS) and saved 39% in electricity to date

Case Studies

EP&T Global have an unrivalled track record of delivery, working in multiple sectors to unlock our clients cost savings and sustainability goals. A selection of our achievements are provided below:

  The Gardens Furnished Apartments, Dubai

This pilot project was for master developer Nakheel PJSC. The target was to reduce baseline electricity consumption by 19% for two of their residential towers in The Gardens Furnished Apartments complex.

EP&T Global exceeded the target and achieved a 27.4% reduction in electricity consumption and a Return on Investment of 13 months through effective utilisation of the EDGE Intelligent System and MARS process.

Nakheel PJSC won the Emirates Energy Award for the project in 2009.

  Tornado Tower, Doha, Qatar

The Tornado Tower is a 52 floor architectural icon of the West Bay skyline of Doha. The Tornado Tower was designed to the highest specifications and constructed according to international safety and security standards. The tower's high profile tenants benefit from superior amenities and a Class A performance specification.

EP&T Global's EDGE Smart Billing System was implemented in the Tornado Tower to provide a flexible, accurate and complete practical solution for tenant revenue assurance and utility monitoring for sustainability purposes.

  York House

EP&T Global began its partnership with British Land with a pilot project at their Head Office, York House in September 2009. Due to the pilot’s success, our systems are now applied to ten of their office buildings and one shopping centre. 

Our monitoring systems were placed to collect gas, electricity and water data which were integrated to existing metering systems. The EDGE MARS tool was also integrated to identify significant operational issues where our analysts worked with British Land’s site management team to prioritise and implement solutions. To date, we have saved 44% in energy, as well as £136,000 and over 1,150 tonnes of carbon emissions.

  120 Collins Street, Melbourne

120 Collins St is a prominent postmodern style building, paying homage to New York's grand Art Deco buidlings. Located in the Paris end of Melbourne's Collins Street, the premium grade office building with a 64,507 sqm NLA and 50 floors is the tallest office structure in Australia. The building is home to a number of high-profile tenants including Bluescope Steel, Citigroup, Merrill Lynch and BlackRock.

EP&T Global implemented the EDGE Intelligent System at this site as part of a portfolio based roll out, reducing the building's CO2 emissions by 546,000 kg/yr.